Zorlu Center Metro - Metrobus Pedestrian Transition Tunnel Project

The project aims to take the circulation underground in order to relieve the pedestrian traffic between Zorlu Center - Gayrettepe Metro Station - Zincirlikuyu Metrobus Station and reduce the travel time.

Within the scope of the project which is aimed to facilitate pedestrian access in the high traffic areas, with three underpasses with 368-meter-long moving walkway, 717 m bored tunnel, 3 cut-cover tunnels with a total length of 250 m, 2 shafts with 12 m diameter and 2 elevator shafts with 4.5 m diameter have been completed.  

Location TÜRKİYE
Client Istanbul Metropolitan Municipality
Project Scope Metro And Metrobus Pedestrian Connection Tunnel Construction

To enable us and our partners to remember you and understand how you and other visitors use our website, we use cookies and other technologies. You can view the full list of these technologies and learn more about how we use cookies by visiting our Cookie Policy. Do you accept our cookie policy to enhance your experience on our site?

Accept