Zorlu Center Metro - Metrobus Pedestrian Transition Tunnel Project

The project aims to take the circulation underground in order to relieve the pedestrian traffic between Zorlu Center - Gayrettepe Metro Station - Zincirlikuyu Metrobus Station and reduce the travel time.

Within the scope of the project, 717 m bored tunnel, 3 open-close tunnels with a total length of 250 m, 2 shafts with 12 m diameter and 2 elevator shafts with 4.5 m diameter have been completed.

Location TURKEY
Client Istanbul Metropolitan Municipality
Project Scope Metro and Metrobus Pedestrian Connection Tunnel Construction